Advisories
-
Public Advisory: Hydro completing work on the Buchans Forebay Dam
Read More: Public Advisory: Hydro completing work on the Buchans Forebay DamNewfoundland and Labrador Hydro would like to advise the public of work on the Buchans Forebay Dam starting Thursday, September 4. This work is part of a dam upgrades project to extend the life of the dam and is anticipated be completed by late October. People travelling in the area of the Buchans Rail Trail…
-
Public Advisory: Extended outage planned for Labrador West on September 14, 2025
Read More: Public Advisory: Extended outage planned for Labrador West on September 14, 2025Newfoundland and Labrador Hydro would like to advise customers in Labrador West that this year’s extended power outage will take place from 7 a.m. to 7 p.m. on Sunday, September 14. This extended outage is needed in order for Hydro crews to safely conduct critical annual maintenance and equipment upgrades at the Wabush terminal station,…
-
Public Advisory: Electrode Line Reinforcement (continuation of 2024 work)
Read More: Public Advisory: Electrode Line Reinforcement (continuation of 2024 work)Transport Canada Navigation Protection Program: Registry Number 13517 | continuation of work from 2024 (previously posted under Registry #11551) The electrode line that runs between Indian Pond and Conception Bay has experienced some erosion since operation (2016). The risk of further erosion is present during significant weather events that lead to high waves and storm…
-
Public Advisory: Hydro Monitoring Paddy’s Pond fire for potential power impacts in metro area
Read More: Public Advisory: Hydro Monitoring Paddy’s Pond fire for potential power impacts in metro areaAugust 15 | 2:05 p.m. As we move into the weekend, we wanted to assure customers that our teams continue to monitor the fires across the province and are working hard, not only to keep power flowing to our customers, but also to support the efforts of the Province in their response. In Paddy’s Pond,…
-
Public Notice: Replacement of pre-existing bridge in Squid Cove
Read More: Public Notice: Replacement of pre-existing bridge in Squid CoveHydro, gives notice that a submission has been added to the Navigable Waters Registry pursuant to the Canadian Navigable Waters Act for public comment. Hydro has deposited with the Minister of Transport, on the on-line Common Project Search Registry (http://cps.canada.ca/) and under registry number 13491, a description of the following work, its site and plans: Replacement…
-
Advisory: Update on Wildfire Impact on Holyrood Plant
Read More: Advisory: Update on Wildfire Impact on Holyrood PlantEarlier this evening, Newfoundland and Labrador Hydro (Hydro) evacuated all non-essential personnel from its Holyrood Thermal Generating Station. The plant and surrounding site have been secured with emergency personnel remaining on-site, while safe to do so, overnight to monitor the situation. Hydro is in close contact with the Province’s emergency response and is monitoring the…
-
Hydro completing work to upgrade the L’Anse-Au-Loup to Red Bay distribution system
Read More: Hydro completing work to upgrade the L’Anse-Au-Loup to Red Bay distribution systemNewfoundland and Labrador Hydro would like to advise the public that on Monday, June 23, work will begin to complete upgrades to the distribution system that runs from L’Anse-Au-Loup to Red Bay, Labrador. This work is necessary to improve system reliability and will help reduce outages and restoration times. This work will include: Work is…
-
Public Notice: Road Maintenance and Upgrades on the Labrador Transmission Asset (LTA)
Read More: Public Notice: Road Maintenance and Upgrades on the Labrador Transmission Asset (LTA)Newfoundland and Labrador Hydro is advising the public of culvert installations on the Labrador Transmission Asset (LTA) access road as part of our annual road maintenance and upgrades work on existing transmission lines. Maintaining safe, reliable access to our transmission assets and reducing our environmental impacts as much as possible is a priority. A notice…
-
Public Safety Notice: Blasting and Drilling operations in south side of Menihek
Read More: Public Safety Notice: Blasting and Drilling operations in south side of MenihekNewfoundland and Labrador Hydro is advising the public of continuing blasting and drilling operations in an established quarry in the south side of Menihek starting June 14th and anticipated until November, 2025. This is part of the Dyke Rip Rap Refurbishment project and will help to ensure the continued safe and reliable delivery of power…
-
Public Safety Advisory – Potential to spill at Star Lake ended
Read More: Public Safety Advisory – Potential to spill at Star Lake endedNewfoundland and Labrador Hydro is advising residents, cabin owners and travellers in the Star Lake area of Central Newfoundland that there is no longer the potential for releases of water at the Star Lake Spillway into Star Brook and then Beothuk Lake.