One plan for increasing energy capacity while safeguarding the reliability of service to customers is an expansion to add an eighth generating unit, which has long been determined as a viable and preferable resource to develop for additional firm capacity supply for the island.
The Bay d’Espoir Unit 8 Project will supplement the existing Bay d’Espoir development by expanding the existing Powerhouse No. 2 for the addition of a new hydroelectric generating unit.
The Project will include the engineering, procurement, construction, installation, commissioning, and testing of all works associated, including:
- Headrace channel enhancements.
- New intake, intake building, penstock and ancillary services.
- Expansion of existing Powerhouse No. 2.
- New turbine – generator (nominal capacity of 150 MW) to be installed in the Powerhouse No. 2 expansion.
- New transformer and isolated phase bus.
- New auxiliary mechanical, electrical, protection and control, telecontrol and telecommunications and communications equipment.
- Tailrace channel enhancements.
- New 230 kV transmission line from new Unit 8 step-up transformer to the existing Terminal Station No. 2.
- Expansion and modifications to Terminal Station No. 2 to accept transmission line interconnection.